Ecomak successfully executes repeat order: High Temperature Fume Extraction System (FES) for 20T Convertor
Ecomak has signed a contract for the supply and commissioning of the filtration system for a WtE plant to be built in South East Asia. by Ecomak Systems The Waste to Energy facility envisages 2 boiler lines of 350 TPD capacity each (700 TPD total), with